The work on Los Gigantes beach is going ahead at a good pace. The huge rolls of wire meshing, which have been shipped in from Santander from the mainland are currently being crane lifted, unrolled and pinned into position.
Posted by dolly diver on February 23, 2011
Posted in Local News | Tagged With: Los Gigantes beach, work
The work on Los Gigantes beach is going ahead at a good pace. The huge rolls of wire meshing, which have been shipped in from Santander from the mainland are currently being crane lifted, unrolled and pinned into position.